Technical Bulletin
Permanent Real Time Downhole Pressure & Temperature
Goal: Lower Cost and Increase Profit.
Method: Real time Permanent Downhole Pressure and Temperature Data.
How: Identify Reservoir Parameters, Well bore changes, Inflow, Field drainage, Crossflow, Connectivity, Geology, Fracturing, and Stimulation.
With What: The proven best tool (SPARTEK) and the company with 27 years of service in the Permian Basin.
Why: One source solutions for the complete system including wellhead adapters, tubing hangers, totally encapsulated cable, protectors, communication, and automation installed at the lowest cost and shortest time. GPT Engineers and technicians support insure that everything in the well works the best possible.